Barbara ZohnPage 1
of 4 Barbara s. zohn 2 Diane
Lane, Green Pond, SC 29446 · Danceican@Yahoo.com · C (843)
599-1935 Senior Project Controls Specialist with 25+ years of
experience in the practical application of project management principles
across multiple and diverse Engineering, Procurement, Outage, Construction
and Commissioning project schedules for government, nuclear and
private-sector clients. Expertise in WBS and life cycle development,
project integration, theory of constraints, critical path analysis, risk
management, recovery planning, change management, earned value principles and
methodologies, as well as cost monitoring analysis and reporting.
Specialized in schedule integration across multiple, diverse and complex
projects coming from a wide variety of sources resulting in logic-driven,
critical path schedules, resource profiles and earned value plans that define
technical scope from design to build. Possess strong, technical, verbal
and written skills and ability to effectively lead small teams and interact
with internal and external customers at both the technical and management levels.
Well versed in contract negotiations and oversight, project estimating,
document preparation, government regulations and material
purchasing/acquisition. Self-motivated, detail oriented professional
whose experience includes a rare balance of cost and schedule abilities. SUMMARY OF QUALIFICATIONS ·
Master Schedule Integration and Critical Path Project
Analysis & Recovery Plans ·
Construction, Vendor, Facility Maintenance and Outage
Working Schedule Development ·
Contract Negotiations, Proposal Review, Award &
Oversight, SOW & Vendor Procurements ·
Detailed Resource Estimating, Planning & Forecasting ·
Life Cycle Plans, Budget Development, Baseline Management
& Analysis ·
EV Analysis and Project Reporting ·
Cost Analysis ·
Earned Value Management Systems and Practices ·
Work Breakdown Structures (WBS) ·
Risk Analysis/Management ·
Training and Process Development ·
Passport Work Package Planning professional Experience construction/outage
scheduler2015-2015 SAULSBURY
INDUSTRIES (SI) Jenkinsville, SC Project scheduler for the Maintenance Modifications Contractor at VC
Summer Nuclear Generating Station responsible to execute major
maintenance projects including Post- Fukushima NRC directed requirements,
on-line and outage for a single water-cooled reactor. Worked with construction
management team and craft to develop resource-loaded, logic-driven
implementation schedules. Produced man-power reports and histograms to define
and manage man-power needs. Monitored and reported performance
against controlled baselines. Provided critical path analysis and
recovery plans as appropriate. Required Clearance and background
checks. evms SPECIALIST2014-2015 bechtel
Richland, WA Staff Augmentation EVMS Specialist – Bechtel
Waste Treatment Plant (WTP) Project
to design construct and commission a $12.2 billion, radioactive-waste
treatment plant for the U.S. Department of Energy (DOE). Coordinate training classes, mentor project
personnel and provide program oversight for establishing earned value management
best practices. Establish a plan, provide guidance, direction and
coordination surveillance response activities for joint internal DOE/BNI
surveillances or external project EVMS certification surveillance by OAPM,
the governing surveillance audit agency. Establish and maintain CAM
Notebooks, including flow charting EVMS work processes and storyboards. SENIOR PROJECT CONTROLS
SPECIALIST2012-2014 Savannah river site/value
added solultions (vas)Aiken, SC Staff Augmentation Provided
cost and schedule support to Design Services (DS) Team at Savannah River Site (SRS). A nuclear reservation owned by U.S.
Department of Energy, whose primary mission now is cleanup of nuclear
buildup. DS is a support organization who provides engineering services
as requested across the complex on a variety of projects including
design/build, facility modifications, maintenance and remediation.
Major Projects include L Area Basin Mods, a $10M project to modify and expand
facilities for additional storage capacity in the L Area basin. SENIOR
PROJECT CONTROLS SPECIALIST2011-2012 NSTec/Teledyne
Brown/CAPSTONE Las Vegas, NV Staff Augmentation Provided all aspects of project controls support to
NSTec Construction group at Nevada
Test Site in support of national
defense as well as research and development programs for the National Nuclear
Security Administration. Major projects included the Gemini Project, a
research and development, experimental project that produced plutonium
data. The construction effort involved all aspects of preparing
underground facilities to accept and conduct planned experiments, including
civil, mechanical and electrical construction efforts to re-configure the
experimental areas for safe and reliable operations. Planning and
oversight for the on-site machining and fabrication of various vessel related
items. Mercury Distribution Power Upgrades Project provided the
necessary construction services to upgrade capacity and operating voltage of
two overhead power distribution lines from 4,160 volts to 12,470 volts. SENIOR PROJECT CONTROLS SPECIALIST2011-2011 SHAW GROUPAiken, SC I&C
field construction senior planner scheduler for the Mixed Oxide Fuel
Fabrication Facility (MOX) construction project, the nation’s only mixed oxide
fuel (MOX) manufacturing plant that when operational will convert legacy
weapons-grade plutonium to fuel suitable for commercial power reactors.
Total budgeted scope 146m+. Coordinated with field construction
supervisor and project team to develop field construction, logic driven,
resource loaded schedules that were fully integrated from design to
turnover. Deliverables included resource allocation profiles,
critical path working level schedules and EVMS reports for assigned scope. SENIOR
PROJECT CONTROLS SPECIALIST2010-2011 PROJECT
SERVICES GROUPAiken, SC Staff Augmentation Senior
Project Controls Specialist, retained to provide schedule development and
cost control support for Savannah River
Site (SRS) Design Services on small
to large projects including Facility Modifications of F-Canyon to accommodate
remediation and repackaging of TRU Waste containers for long term
storage. Project scope included partial demolition and installation of
three Airlock Structures including infra-structure upgrades such as
electrical and mechanical systems and components. Successful completion
of this assignment required application of advanced scheduling, cost control,
and EVMS methodologies and practices. SENIOR
PROJECT CONTROLSL SPECIALIST/TEAM LEAD2009-2010 PROJECT
SERVICES GROUP (PSG) Richland, WA Staff Augmentation Assigned to Department of Energy’s (DOE) Plutonium
Finishing Plant (PFP) D&D Project at the Hanford Nuclear Reservation whose mission was to deactivate and demolish
existing Reactors and move entire complex to slab on grade. As Team
Lead of eight cost and schedule analysts, developed and implemented
strategies and requirements that aligned detailed working schedules with
baseline plans. Responsible to transfer and validate financial data
from estimating tools (CEIS) to schedule database (P6) to Cost Processing
Tool (Cobra). Lead teams including Cost Account Managers (CAM’s) to
successfully develop logic-driven schedules and Earned Value Management
plans. Developed, implemented, and integrated the Life Cycle Baselines
and Fiscal Year Task Plans for 14 separate projects. Cost management
duties included cost analysis and monthly preparation of estimates to
complete. Worked with Procurement to implement and monitor external vendor
contracts. Prepared and implemented Baseline changes according to
policy. Prepared critical path schedules and what-if scenarios, monthly
schedule updates, Variance Analysis Reports, revised Spend Forecasts and
recovery action plans. SENIOR project controls specialist2008 - 2009 Redhawk corporationRichland, Washington Staff Augmentation Hired as technical expert during R19 Outage, to
structure and implement P6 at Columbia
Generating Station, Nuclear Power Plant, a 1,150-megawatt boiling water reactor that uses nuclear fission to
produce heat. Developed, analyzed and monitored detailed Critical Path
Outage schedules (two per day) for Transformer Yard (115kV, 230kV, 500kV and
25kV Voltage Systems). Conducted contractor schedule development
reviews and integrated into Master Schedule. Mentored and directed
manpower loading and profiling. Performed daily processing of Passport
to P6 Transfers, and implemented Baseline Configuration Control Process. SENIOR project controls specialist2007-2008 Project services groupRichland Washington Staff Augmentation Lead Scheduler Mechanical and Process Engineering
(M&PE) for Bechtel
National on the Nuclear Waste Treatment Plant (WTP) Project to design, construct and commission
world’s largest radioactive waste treatment plant for U.S. Department of
Energy. Worked with engineering teams to develop master schedule for
mechanical engineering systems for six different refining facilities.
Prepared, loaded and performed analysis for manpower loading and
profiling. Created and submitted Baseline change control trends for
schedule modifications. Completed bi-weekly and monthly forecast status,
variance analysis and recovery plans. SENIOR project controls specialist2004-2007 BOEING AEROSPACESeattle, Washington Staff Augmentation Project Lead for Master Program Integrated Schedules
that combined Boeing and world-wide International Partner schedules into one
master integrated plan for Boeing
787 Dream Liner Commercial Airplane Program, a long-range, mid-size twin engine jet airline using composite
materials as the primary material in construction of its airframe.
Conducted supplier workshops for International Partners that defined schedule
and performance requirements for integration into the program Master
schedule. Successfully defined and implemented processes and
guided/mentored first time development and use of Critical Path Schedules for
787 Program. Core Team member responsible to implement and
administer training, tools and processes for the Program. Taught Earned
Value Management Training. Master Scheduler for Wiring Integration –
design to assembly. project controls specialist2003-2004 HANFORD NUCLEAR RESERVATIONRichland, WA Staff Augmentation Developed and managed Project integrated schedules
for Hanford Radiological Tank Waste Retrieval and
Closure Projects, an effort
dedicated to pump a series of underground storage tanks ranging in capacity
from 55,000 gallons to more than 1,000,000 gallons of mixed liquid and solid
wastes. Established program cost and schedule Life Cycle Plans.
Performed routine schedule status updates and customer Earned Value
reports. Coordinated and implemented approved Baseline changes
according to Department of Energy (DOE) guidance. Managed contractor construction
schedules. Developed what-if schedules to reflect Program funding and
scope changes/recovery actions. program manager2000-2002 BOEING AEROSPACEEverett, WA Staff Augmentation Responsible for the development of resource loaded
schedules to guide and direct factory installations using Primavera Project
Planner for The Enterprise (P3E) on Boeing’s
777 Commercial Airline Program.
Provided expert guidance in the development, training and implementation of
Earned Value methodologies and tools and Baseline Management processes.
Mentored junior schedulers, Control Account Managers and others in financial
planning, monitoring, and reporting of Program plans. Utilized Microfusion
Millennium and wInsight to track actual costs and provide weekly and monthly
Earned Value reports. project controls specialist1998-2000 BECHTEL NEVADA
Las Vegas, NV Staff Augmentation Consultant to Bechtel
Nevada Environmental Remediation Projects at the Nevada Test Site where I developed Fiscal Year Cost and Schedule
Baselines for client approval and Program Management. Integrated and
maintained master schedule that contained 40 environmental remediation sub‑projects.
Monitored schedules to ensure successful and timely completion of 15 fee
milestone projects. Led Project Controls Team to develop and
standardize estimating, scheduling, and cost control processes.
Performed routine updates and assisted project leaders in the development of
independent estimates at completion and recommended appropriate recovery
plans and corrective actions. Prepared management reports for the
Department of Energy (DOE). Prepared and incorporated baseline change
proposals for new work or revisions to existing work while ensuring strict
adherence to formalized procedures and policies. planner/scheduler/contract administrator1996-1998 westinghouse hanford
company, fluor daniel corpRichland, WA Provided scheduling and contract administration
support to Plutonium Finishing Plant, Hanford Nuclear
Reservation. Utilized ABC
Cost Estimating methodologies to generate detailed cost estimates that
defined technical scope, functional performance requirements, technical
standards and milestones for the Plutonium Finishing Plant. Led Project
and Cost Account Managers, to develop Baseline schedules and
supporting documentation. Developed logic driven, resource loaded
Life-Cycle schedules in Project 2/Seriex X (P/X), and Primavera P3.
Organized and conducted Fiscal Year Planning workshops. Generated Cost
Account Plans within the Financial Data System as part of the Multi‑Year
Program development process. Progressed approved project files monthly
and generated earned value within the financial system . Assisted Cost
Account Managers in preparing variance analysis reports, etc. planner/scheduler/contract administrator1987-1996 westinghouse hanford
company, fluor daniel corpRichland, WA Planner/Scheduler to Total Quality & Performance
Evaluation Team. Developed and maintained organizational level
master project management schedule. Participated in all aspects of
organizational finance including monthly progress reports, fiscal year
spending forecasts, and development of direct and indirect fiscal year
budgets. Placed contracts with external vendors and monitored
contractor performance and invoices. Managed all aspects of an
Interworks Request Contract, including detailed scopes of work, verifying
cost estimates and expenses. Served as technical representative for
overall contract. Point‑of‑contact for company‑wide training and
process improvement tools. Prepared weekly reports, presentations, and
special assignment requests software expertise FDS/MPM/COBRA,
Millennium, wInsight, Project 2/Series (PX), Primavera Project Planner (P3),
Primavera P6, Access, Excel, Word Perfect, Word, Power Point, Microsoft
Project, Artemius, Passport, Crystal Reports, PRISM certifications & clearances Qualified
for Project Management Professional (PMP) “Q
& L” Security Clearance, Department of Energy (held during contract) Clearance/Background
Verification for entry into operating Nuclear Facilities Rerences |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|